Smithy Way Flats Leeds

Categories: 27 Apr 2015

Joshua Thomas Access Were employed to mange the install of perimeter building scaffold by Leeds University Facilities Department.  The works were to facilitate the perimeter grit blasting of the existing concrete building, also allowing access for window install and general remedial works.

The scaffold was design and checked in-house using modelling software.  To ensure environmental compliance the scaffold was encapsulated in an outer membrane.

The works were executed without incident and within the specified progamme durations and budge.  Through early planning the JTA team were able to develop a solution that was compliant with the work in hand and efficient to install.